"Can you do better on that?" turns up on half the quotes you send. Here's what the question actually means, what to trade instead of your margin, and how to hold a price without losing the job.
You spent an hour pricing it properly and the first thing back is a request for a discount. Most tradies do one of two things — drop the price on the spot, or dig in and lose the job — and both are expensive. There's a third option, which is to move something other than the number. This guide covers what a client is really asking when they push on price, what you can trade that costs you less than margin does, the words that hold a price without an argument, and the point where the right answer is no.
Doing this job for a living? See job management in ServiceYak.
What a discount actually costs you
Take 10% off a price and it feels like you gave away a tenth of something. You didn't. The discount comes out of the margin, not out of the whole number — your materials and your labour cost exactly the same as they did before you were generous.
On a job priced at $4,000 with $2,800 of materials and labour behind it, you were making $1,200. Knock $400 off to win it and you're making $800. A tenth off the price is a third off the profit.
| Discount off the price | Share of your profit it takes | Extra work needed to end up level |
|---|---|---|
| 5% | 17% | 20% more |
| 10% | 33% | 50% more |
| 15% | 50% | Twice as much |
| 20% | 67% | Three times as much |
Run that table against your own margin before your next quote goes out. It's the single fastest way to stop discounting, because the conversation changes once you know that a small discount to win one job means doing half a job again for nothing.
This guide assumes the price is right in the first place. If you're not confident it is, that's a different problem — start with working out your charge-out rate and come back. Negotiating from a number you don't trust is why people cave.
Work out what they're actually asking
"Can you do better on that?" is four different questions wearing the same words, and they need four different answers. Before you respond to the price, find out which one you've got.
- Reflex. Some people ask on everything — the car, the couch, the quote. They're not expecting a yes and they'll proceed either way. A polite, calm no ends it.
- A real ceiling. They have a fixed amount and your number is above it. This one is workable, but not by cutting your price — by cutting the job.
- They're comparing. Someone else quoted less. Almost always for a different job, and you can't answer that until you've seen it.
- They're testing. Some clients push to find out whether your price is real. If it moves the moment they ask, everything you quote them for the next five years is negotiable.
So ask before you answer. "What sort of budget were you working to?" or "Is it the total, or the scope?" Both are ordinary questions and both tell you which conversation you're in. The worst thing you can do is guess and discount pre-emptively.
There's a fifth version worth naming: the client who opens on price, before they've told you what the job is. That's not a negotiation, it's a warning — see which jobs to say no to.
Move something other than the number
The rule that makes all of this work: if the price moves, something else moves with it. A price you drop for nothing tells the client the first number was made up. A price you drop in exchange for something is just a different deal.
And most of what you can trade costs you far less than margin does:
- Scope. Take something out. They supply the fittings, you do the two bathrooms now and the laundry next year, you paint the ceilings and leave the walls. The price came down because the job got smaller — which is honest, and it protects your rate.
- Timing. "That price works if you can let me do it the week after next, when I'm already in the street." Filling a gap in your calendar is genuinely worth money to you, and it costs the client nothing.
- Payment terms. Paid in full on the day, or a larger deposit up front. Money now is worth more than the same money in six weeks, and there's no chasing attached to it.
- Labour they can do. They clear the site, cart the spoil, do the demolition, handle the make-good painting. Hours off your bill that were never your best-paid hours anyway.
- Volume that's actually volume. Six units at a better rate is a real deal. One job at a better rate because there might be more later is not.
Every one of those keeps your price per hour intact, which matters more than this one job. The number you settle on here is the number this client expects next time, and the one they'll mention to the neighbour.
Holding the price in the actual conversation
When the answer is that the price stands, the way you say it decides whether you keep the job and the relationship. A few things that consistently work:
- Give the number and stop talking. Most discounts are given away in the silence after the price, by the tradie, before the client has said anything at all. Say the number, then wait.
- Answer once, briefly. "That's the price for that scope" is a complete answer. If they ask why, give one honest sentence. The second explanation is the one that loses you the job — it reads as a plea rather than a price.
- Break the quote out. An itemised quote negotiates better than a lump sum, because the question stops being "can you come down" and becomes "which of these do you want". Give them somewhere to go that isn't your margin.
- Say what's inside the number. Licence and insurance, who actually turns up, the warranty, the compliance paperwork, the rubbish going away, the floor covered. Not a sales pitch — just the list of things a cheaper quote often leaves for the client to discover.
- Leave the quote on the table. Don't withdraw it in a huff. "The quote's good until the 30th if you change your mind" costs nothing, and a decent share of the people who said it was too expensive come back when the cheap bloke doesn't show up.
Never apologise for the price. An apology is an invitation — it tells the client you're not sure the number is right either, and any client who negotiates for a living will hear it immediately.
When they wave a cheaper quote at you
Ask to see it. Most clients will show you, and most of the time it isn't the same job — which means you're not actually the expensive one, you're the complete one.
| What's often left out | What it costs when it turns up |
|---|---|
| Rubbish removal and tip fees | A skip, or a Saturday, at the end of the job |
| Making good | Patching, painting and tiles the client now has to organise themselves |
| Certificates and compliance paperwork | A second trade, or a problem at sale time |
| The fittings | A range nobody's heard of, and a warranty conversation in two years |
| Access and protection | Scaffold, floor coverings, traffic control — priced as an extra once work starts |
| GST | A price shown ex-GST reads 10% cheaper than one that isn't |
Walk the two documents side by side, line by line, and let the client draw the conclusion. Compare the scope, never the tradie — bagging the other quote makes you look worried, and clients remember it.
If it genuinely is the same job for less, then either their costs are lower than yours or they've made a mistake. You can't fix the first by matching them, and you don't want to inherit the second. That's a job to let go.
Knowing when it's a no
There's a point where you're not negotiating any more, you're being ground down. The tells are worth learning, because they show up before the job starts and they don't improve after it does:
- They want the price down without the scope changing, and keep coming back for another go.
- The pressure is on the deposit or the terms as well as the number.
- They've told you what your costs should be, or what the job "should" take.
- Every concession you make is banked and followed by another ask.
Someone who grinds you before you've started will grind you at variation time, and again at invoice time. The discount isn't the whole cost — the arguments are.
Say it plainly and early: "I don't think I'm the right fit for this one — I can't do it properly at that number." No lecture, no resentment, and a referral if you have someone genuinely suited. You keep the relationship, and you keep the week free for a job that pays.
ServiceYak builds itemised quotes off your saved rates and lets you send optional line items the client can add or remove themselves — so the conversation lands on what's in the job rather than on your bottom line. Job costing then shows what every finished job actually made, including the ones where you moved on price.
Frequently asked questions
What do I say when a client asks me to lower my price?
Ask what's behind it before you answer — whether it's the total, the scope, or another quote. Then trade rather than discount: take work out, move the timing to suit your calendar, or improve the payment terms. If the price has to stand, "that's the price for that scope" said once, without apology, is a complete answer.
How much does a 10% discount actually cost me?
Far more than 10%. The discount comes out of your margin, not your total. On a job making a 30% gross margin, taking 10% off the price takes about a third of the profit, and you'd need to sell 50% more work at the new price to end up where you started.
Should I ever discount to win a job?
Occasionally, and only when something real comes back the other way — the job fills a genuine gap in a quiet week, it's next door to work you're already doing, or you're being paid in full on the day. Make it visibly one-off and tied to that reason, or it becomes your new price for that client.
How do I compete with a cheaper quote?
Ask to see it and compare the two line by line. Rubbish removal, making good, certificates, protection, the actual fittings and whether GST is shown all move a price, and one of them is usually the difference. Compare the scope, not the other tradie — and if it genuinely is the same job for less, let that one go.