Site Risk, and What to Do When Someone's Hurt
Most site injuries come from a short list of the same things. Here's how to run an inspection that actually catches them, and exactly what you do — in order — in the hour after someone gets hurt.
Nobody plans the first serious injury in their business, which is why it goes badly. The ambulance gets called and then there's a long pause where nobody knows whether the regulator has to be told, whether the site can be cleaned up, or who lodges the claim. All of that is answerable in advance, and it takes an afternoon. This guide covers the two halves of the job: running site inspections that catch hazards before they become incidents, and knowing exactly what happens in the hour and the fortnight after someone gets hurt.
Doing this job for a living? See job management in ServiceYak.
Why the inspection is worth the ten minutes
A site inspection is a walk with a purpose: look at the site as it is today, find what's changed, and fix what you find. It's the cheapest safety control you have, and it does three separate jobs.
- It catches the hazard while it's still cheap. A lead across a walkway costs nothing to move today and a lot to explain next week.
- It's your evidence. Duties are framed around what's reasonably practicable, and a dated record of inspections and the things you fixed is how you demonstrate you were actually managing risk rather than hoping.
- It sets the tone. A crew that sees the boss walking the site and acting on what they find treats safety as real. A crew that never sees it draws the obvious conclusion.
The frequency depends on the work. A fast-moving construction site changes daily; a maintenance round changes at every address. Set a rhythm you'll actually keep — a short walk every day beats a thorough one every month that never happens.
What to look for
Injuries in the trades cluster into a short list, and the same list makes a decent inspection checklist. Work through it in this order:
| Category | On the walk, look at |
|---|---|
| Body stressing and manual handling | Lifts being done alone, materials at ground level, poor access, no mechanical aid, repetitive awkward postures |
| Falls, slips and trips | Ladders and access, edge protection, leads and hoses across paths, offcuts and rubbish, holes and level changes, wet or icy surfaces, lighting |
| Being hit by moving or falling objects | Material stacked at height, unsecured loads, exclusion zones under work, tool tethering, plant movement paths |
| Cuts, crush and fractures | Guarding on tools, blade condition, pinch points, isolation before servicing plant |
| Vehicles and mobile plant | Reversing and pedestrian separation, spotters, site access and parking, load restraint |
| Occupational disease | Silica dust from cutting and grinding, asbestos in older buildings, chemicals and solvents, noise, sun exposure, vibration from hand tools |
| Fatigue and mental health | Hours being worked, back-to-back call-outs, someone who's gone quiet |
The last two categories are the ones that get skipped because nothing visible is happening. They're also the ones with the worst long-run outcomes — occupational disease from dust, and the mental health toll the construction industry carries. Put them on the checklist so they get looked at deliberately.
Making the checklist usable
The best checklist is the one that gets filled in. Three things decide that:
- Short. One page, on a phone, done in ten minutes. A twelve-page form gets ticked without being read, which is worse than no form.
- Specific to your trade and your site. A generic construction checklist asks about cranes and says nothing about the roof space you're working in.
- Actionable. Every item you flag needs an owner and a date, or the walk is just documentation. Turn findings into tasks on the job.
And it has to be stored. A completed inspection that lives in someone's photos isn't evidence you can produce. Attach it to the job so it's findable in a year.
ServiceYak keeps the job on one card — site photos, notes and the documents that belong to it — so an inspection done on site sticks to the job, and the thing you flagged becomes a task instead of a memory.
When someone gets hurt: the first hour
Have this order written down and known by everyone, because nobody thinks clearly at the time.
- Make it safe, then treat the person. Don't create a second casualty. If the hazard is still live — power, plant, an unstable structure — deal with that first, then provide first aid. Call 000 for anything serious, and don't spend time debating whether it's serious enough.
- Secure the area. Stop work in the vicinity and keep people out. This protects other workers and preserves what happened.
- Work out whether it's notifiable. Death, serious injury or illness, and dangerous incidents that expose anyone to a serious risk are notifiable to your state or territory regulator — including near misses where nobody was hurt. The categories and definitions are set by the regulations, so know yours before you need them.
- Notify immediately if it is. Immediately means immediately, by phone, not at the end of the day. The regulator will usually require written notification to follow within a set period, and may direct you further.
- Preserve the site. For a notifiable incident the site must be left undisturbed until an inspector arrives or you're told otherwise. You may still act to help an injured person, make the site safe, or prevent further harm — but not to clean up.
- Tell the people who need to know. The worker's emergency contact, the principal contractor, your insurer, and anyone else sharing the site.
- Record it. Every injury goes in your incident register, including the minor ones. Photos, names of witnesses, what was happening, what the conditions were — captured while it's fresh.
Notification timeframes, the definition of a serious injury, and how long the site must be preserved differ between jurisdictions. Get the current requirements from your regulator now and pin them up, along with the notification phone number. The middle of an emergency is a bad time to be searching a website.
The fortnight after
Once the immediate response is done, three things run in parallel and none of them should wait.
- The workers compensation claim. Help the injured person lodge it — don't leave them to work out the scheme on their own. Your obligations as an employer include notifying your insurer within a set period, and in most jurisdictions supporting a return-to-work plan. The scheme, the forms and the timeframes are set by your state authority.
- The investigation. Find the cause, not the blame. Ask what the conditions were, what the pressures were and what control failed — "they weren't being careful" is where a bad investigation stops and a useful one starts.
- The corrective action. Change the control, and change it up the hierarchy if you can. Then update the SWMS, the checklist and the induction so the change is in the system rather than in a conversation.
Then follow up with the person. Recovery is faster when someone stays connected to work, and suitable duties are usually part of the scheme rather than a favour you're doing. Staying in contact is also the single strongest signal to the rest of the crew about what kind of business they work for.
The injuries you can't see on a walk
Psychosocial hazards — unreasonable workload, long hours, job insecurity, bullying, exposure to traumatic events — are hazards under work health and safety law, with the same duty to identify and control them as a live wire. Several jurisdictions have specific regulations and codes of practice covering them.
The trades carry a well-documented mental health burden, and the culture has historically made it harder to raise. What a small business can practically do is limited but not nothing: keep an eye on hours and call-out load, notice when someone changes, make it normal to ask, and know where to point them.
MATES in Construction works specifically with the Australian construction and trade industries and runs a 24/7 line. Lifeline is on 13 11 14. If someone's in immediate danger, call 000.
Frequently asked questions
What counts as a notifiable incident?
Broadly: a death, a serious injury or illness, or a dangerous incident that exposed someone to a serious risk — including ones where nobody was actually hurt. The precise categories and definitions sit in your state or territory's WHS regulations and there are differences between jurisdictions, so get the current list from your regulator and keep it somewhere you can find it fast.
Can I clean up the site after an incident?
Not if the incident is notifiable. The site has to be left undisturbed until an inspector arrives or the regulator directs otherwise. You can still act to help an injured person, make the site safe, or prevent further harm — but tidying up, moving plant or removing the thing that failed is exactly what you must not do.
Do I have to report a near miss?
If it was a dangerous incident that exposed someone to a serious risk, yes — the duty attaches to the exposure, not to whether anyone was actually injured. A load dropped from a crane into an empty area is notifiable even though nobody was standing there. Beyond the legal requirement, record every near miss internally: they're free warnings.
What are my obligations when a worker is injured?
Provide first aid and get medical help, notify your regulator if the incident is notifiable, record it, notify your workers compensation insurer within the period your state requires, help the worker lodge their claim, and support a return-to-work plan. The specifics are set by your state or territory's workers compensation authority, which is a different body from your WHS regulator in most places.